Name of project
|
Renewal Energy Development Program (REDP)
|
| Total Fund |
NRs.5257370 |
| Duration |
2066/02 \1 B.S. to 2069/09\ 30 B.S. |
| Funding sources |
UNDP/DDCKalikot |
| Contact person of the earlier donor agency |
Anil Panta ( District Engineer) |
| Beneficiary HHs |
1777 HHs |
| VDCs |
Ramnakot, Lalu, Thirpu, Jubitha, RupsaVDCs of Kalikot |
Major Achievements:
- Enhanced and strengthened the capacity of the targeted people so to make good citizen
- Proper and maximum utilization of local resources
- Enhanced income generation to local targeted people by means of developing the rural energy
- Increased loan flow through Entrepreneur by chaining the locally formed groups with entrepreneur.
- Enhanced and strengthened the targeted group by social mobilization
- Formed group and committee with equal participation of male and female keeping in mind that of equal gender development
|